Skip To Main Content

Westmoor Building Plan

Schematic

Schematic design rendering (exterior) from the east side of campus of the cafetorium addition.

Schematic design rendering of the new cafetorium addition from the north side of campus. 

Schematic design rendering of the new cafetorium addition from the north side of campus. 

Schematic design rendering of the entrance to the new cafetorium

Schematic design rendering of the entrance to the new cafetorium.

Schematic design rendering of the new cafetorium.

Schematic design rendering of a corridor connecting the new cafetorium to the current building.

Schematic design rendering of a corridor connecting the new cafetorium to the current building.

Schematic design rendering of a corridor/multi-learning space connecting the new cafetorium and current building.

Schematic design rendering of a corridor/multi-purpose learning space connecting the new cafetorium and current building.

Year Opened: 1966
Total Cost: $13.7MM

Major Projects 

  • Build a cafetorium (cafeteria/auditorium)
  • Add hard surface play area outside 
  • Renovate existing bathrooms throughout the building for ADA compliance
  • Remodel existing multipurpose room to classrooms and new ADA-compliant bathrooms
  • Replace old playground equipment and improve accessibility

Projected Construction Timeline

  • April 2026 - June 2026: Westmoor construction begins
  • Feb. 2027 - April 2027: Westmoor construction completed

Each construction area will be enclosed and separated from students, staff, and daily school activities during the construction projects.

Photo of Construction Cartoon Character with district logo

Podcast Episodes