Westmoor Building Plan

An aerial view of Westmoor shows construction underway on the school's new cafetorium addition on the north side of the building. (Photo: August 11, 2026)

Westmoor 5th-grade students gather for a groundbreaking ceremony on May 26, 2026, to kick off construction!

Schematic design rendering (exterior) from the east side of campus of the cafetorium addition.

Schematic design rendering of the new cafetorium addition from the north side of campus.

Schematic design rendering of the entrance to the new cafetorium.

Schematic design rendering of the new cafetorium.

Schematic design rendering of a corridor connecting the new cafetorium to the current building.

Schematic design rendering of a corridor/multi-purpose learning space connecting the new cafetorium and current building.
Year Opened: 1966
Total Cost: $13.7MM
Major Projects
- Build a cafetorium (cafeteria/auditorium)
- Add hard surface play area outside
- Renovate existing bathrooms throughout the building for ADA compliance
- Remodel existing multipurpose room to classrooms and new ADA-compliant bathrooms
- Replace old playground equipment and improve accessibility
Projected Construction Timeline
- Summer 2026: Westmoor Phase I construction begins (cafetorium and hard surface play area outside) ✅
- Spring 2027: Westmoor Phase I construction completed
- Summer 2027: Westmoor Phase II construction begins (remodel multipurpose room, replace playground equipment)
- August 2027: Westmoor Phase II construction completed
Each construction area will be enclosed and separated from students, staff, and daily school activities during the construction projects.