Meadowbrook Building Plan

Photo of inside of gym under construction

A look inside the new Meadowbrook gymnasium on January 26, 2026. 

Aerial photo of Meadowbrook gymnasium

An aerial shot over the Meadowbrook gymnasium construction on Dec. 2, 2025.

Rendering of the front entrance to the new Meadowbrook School

Exterior schematic design rendering of the New Meadowbrook School front entrance.

Rendering of outdoor classroom of new Meadowbrook School

Exterior schematic design rendering of an outdoor classroom at the new Meadowbrook School. 

Rendering of the new parking lot and new meadowbrook school from the south

Exterior schematic design rendering of the New Meadowbrook School from the south. 

Exterior Photo of new gym construction

A view of the new Meadowbrook gym from the southeast side of the building on October 23, 2025. 

Photo of gym construction

A view of the new Meadowbrook gym from the east side of the building on October 9, 2025. 

Photo of Ginny Hiltz and Meghan Dames in construction

Dr. Ginny Hiltz, Meadowbrook Principal, and Meghan Dames, Meadowbrook Asst. Director of Student Services, check out the construction of the new Meadowbrook gymnasium on September 11, 2025.

Construction kick off at Meadowbrook School

Meadowbrook School kicked off construction with a groundbreaking ceremony on August 15, 2025. Students and members of the Meadowbrook PTO joined Principal Hiltz, Dr. Jason Pearson, and other district leaders at the event. 

Year Opened: 1955
Total Cost: $56MM

As part of the referendum, a new Meadowbrook School will be built. Studies show that it is more cost-effective to replace, rather than repair. To renovate and repair the existing building, it would cost 64% of the price of new construction. New construction results in a school with minimal maintenance and repairs for years to come.   

The two-story building will be constructed behind the existing building. With the construction site enclosed for safety, the old school will operate during construction, allowing children to stay with their school community. 

A new gymnasium will be attached to the rear of the existing building. It will seamlessly attach to the new school once it is completed. 

Key Features 

  • Additional classroom and flexible learning spaces
  • Cafetorium (cafeteria/auditorium) 
  • Expanded play areas for students 
  • Additional parking for staff and visitors, and improved traffic circulation
  • Abundance of natural light 
  • Geothermal system

Projected Construction Timeline

  • August 2025: Meadowbrook gymnasium construction begins
  • March 2026: Meadowbrook gymnasium completed & construction of the new Meadowbrook School begins
  • August 2027: New Meadowbrook School completed

Construction areas will be enclosed and separated from students, staff, and daily school activities during the construction projects.